PROJECT DETAILS
Place of application: Oil Field Poddvorov
Used Cleaning Technology: Downhole equipment cleaning (rod string and tubing) with DIR-X (during production)
The well was cleaned once per year from 2014 to 2021 to date
Well Parameters
Well depth 1500 m, reservoir temperature 54 °C, pump setting depth 1200 m, there was a problem with paraffin deposits
Standard cleaning method 4 day workover / intervention): pull the rod pump and tubing out of the hole, cleaning with steam from paraffin at the surface, casing cleaning with scraper and hot oiling.
Cleaning Process – Heating up the downhole completion during production
Mixture quantity: 4.8 m3
Cleaning time: 3 hours
Pump DIR-X down the annulus to heat up the entire 1200 meters of well downhole completion
Process:
- the well is connected to the central pipe line system (gathering station)
- well production is switched to the separate tank during application
- dynamic fluid level 1 050 – 1 100 m
- pump DIR-X (4.8 m3) down the annulus
- the chemical reaction is divided into four time periods (16, 12, 6 and 2 minutes) after the reaction brake (10 minutes), pump 10 m3 of oil down the annulus to wash out the spent DIR-X with melted aparaffin deposits out of the well to the tank
- reconnect the well to central production pipe line and restart oil production
Result of Cleaning
Circulation pressure after cleaning was much lower. After 3 hours of well cleaning with DIR-X well production was restored to designed capacity and normal operation conditions in a very short time and with lower costs.
Well cleaning with DIR-X is currently performed once per year. The run life – interval between interventions – was increased from 2 years to 5 years.

Nr.1 Clogged production tubing

Nr. 2 Melted paraffine from the well during cleaning TERMO-U